Centro Natural Gas Conversion Kit Operations Instructions Page 27

  • Download
  • Add to my manuals
  • Print
  • Page
    / 32
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 26
2 5
EN
EM
EM
EP
19
Assemble the right door (EN) to the Front Island Wall (EM) by slid-
ing the door into the hinges from the top as shown. No hardware
is needed in this step.
20
Assemble the Left Door (EP) to the lower hinges by sliding the door
into the hinges from left to right, as shown. No hardware is needed
in this step.
Fig. 19
Fig. 20
ER
EQ
21
Attach the Wire Handle for Trash Basket (ER) to the top of the Trash
Basket (EQ). No hardware is needed in this step.
Fig. 21
Turn
Turn
Insert
Page view 26
1 ... 26 27 28 29 30 31 32

Comments to this Manuals

No comments